Deepest CFA piles designed and installed by Browns in our 37 year history
Heavily congested site footprint
Use of a smaller plant to install 18 metre deep casings, including custom design splice/weld connection
Key Challenges
Extremely hard basalt led to an amendment of the fabrication of the drilling head to deal with basalt coring
Programming and (restricted) sequencing of up to nine plant within close proximity – rig clearance, pile size, pile daily proximity (pull through within 10m) and inground obstructions