Public Housing Renewal Project – Flemington
CDL Constructions
>3,700
total workhours
3,582M3
concrete poured
283
foundation piles
44
600mm dia piles
220
750mm dia piles
19
900mm dia piles
Concrete Supply & Placement
Temporary Works Engineering
Quality Assurance
CFA Piles
Unique Attributes
Total 283 foundation piles, including more 3,500m3 of concrete – 44 x 600mm dia piles; 220 x 750mm dia piles; and 19 x 900mm dia piles
Drilling depths ranged between 16-24 metres
Six test piles verified with loads between 13,000kN and 23,000kN
Key Challenges
Concurrent drilling activity within close proximity of each other – requiring careful planning, sequencing and coordination
×
←
→