Public Housing Renewal Project – Flemington

CDL Constructions
  • >3,700total workhours
  • 3,582M3concrete poured
  • 283foundation piles
  • 44600mm dia piles
  • 220750mm dia piles
  • 19900mm dia piles
  • Concrete Supply & Placement
  • Temporary Works Engineering
  • Quality Assurance
  • CFA Piles
  • Total 283 foundation piles, including more 3,500m3 of concrete – 44 x 600mm dia piles; 220 x 750mm dia piles; and 19 x 900mm dia piles
  • Drilling depths ranged between 16-24 metres
  • Six test piles verified with loads between 13,000kN and 23,000kN
  • Concurrent drilling activity within close proximity of each other – requiring careful planning, sequencing and coordination
  • DELTA Group - Projects