Lorimer Street

Crema Constructions
  • >6,500LMtotal drill length
  • >45LMaverage drill length
  • 136CFA foundation piles
  • 36Mdeep central bars
  • 18Mcages
  • 4,500M3high MPa concrete
  • 140Tsteel reinforcement
  • Concrete Supply & Placement
  • Quality Assurance
  • CFA Piles
  • Craneage and Rigging
  • Design Engineering
  • Dynamic Pile Testing
  • Strict sequencing to maximise productivity whilst ensuring the quality of piles which were in close proximity to each other
  • Dynamic pile testing, utilising a 32 tonne hammer dropped from up to 3 metres high. All tests exceeded design capacity
  • Accommodate high voltage power lines running adjacent to the piling line, as well as live services running through the piling line
  • Transport and logistics for delivery of 18 metre cages – with heavy vehicle access to site via reverse only
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects