Ground Lease Model 2 Prahran

CDL Constructions
  • >2,900total workhours
  • >3,350M3concrete poured
  • 320piles
  • 107600mm dia foundation piles
  • 213900mm dia retention piles
  • CFA Foundation Piles
  • Concrete Supply & Placement
  • Temporary Works Engineering
  • Quality Assurance
  • Total 320 foundation and retention piles, including more 3,350m3 of concrete
  • Drilling depths ranged between 6-34 metres
  • Six test piles verified to loads between 5,550kN and 10,130kN
  • Concurrent drilling activity within close proximity of each other – requiring careful planning, sequencing and coordination