Ballarat Base Hospital

Delta Group
  • 307retention piles
  • 750M3concrete poured
  • 37foundation piles
  • 100TReinforced steel
  • 3piles per day
  • 19LMper day
  • Bored Piles
  • Concrete Supply & Placement
  • Temporary Works Engineering
  • Quality Assurance
  • CFA Piles
  • Total 346 foundation and retention piles, including more than 100 tonnes of reo and 750m3 of concrete
  • Regional site location
  • Very hard rock (Basalt) sub-surface conditions
  • Works conducted within close proximity of live services
  • Programming and sequencing of concurrent civil, piling and demolition work areas within close proximity of each other and adjacent to ‘live’ operational hospital
  • Installing piles in a tunnel location with restricted head height limits – deployment of small plant with nose motor to penetrate basalt rock, as well as to provide assistance for drilling fluid