Air Trunk MEL01
Delta Group
314
bored piles – 450mm, 900mm and 1200mm dia
2,000M2
80 MPa tremie mix
Concrete Supply & Placement
Temporary Works Engineering
Quality Assurance
Unique Attributes
Extremely tight delivery schedule
Three 60t – 100t mast rigs capable of penetrating extremely hard basalt subsurface conditions
Total 314 bored piles installed – 70% completed in first sequence
Key Challenges
Concurrent works – leading to piling exclusion zones and relocation of piling equipment
Utilising drilling fluid to enhance drilling efficiency and extend the lifespan of tooling and teeth (due to extremely hard basalt conditions)
×
←
→