Warringal Hospital

Delta Group
  • 109retention piles
  • 25foundation piles
  • 840M3concrete poured
  • 140Treinforced steel
  • Concrete Supply & Placement
  • Temporary Works Engineering
  • Quality Assurance
  • CFA Piles
  • Total 134 foundation and retention piles, including more than 141 tonnes of reo and 840m3 of concrete
  • Hard siltstone sub-surface conditions
  • Works conducted within close proximity of live services
  • Deployment of mast-mounted excavator
  • Piling work areas within close proximity of concurrent/ongoing construction activity and adjacent to ‘live’ operational hospital
  • Quality management for design and delivery of curved piles – up to 300mm