The Fox: NGV Contemporary Gallery

Delta Group
  • >5,900total work hours
  • 13,000M3total concrete poured
  • 979600mm dia piles
  • 2,300M315MPa
  • 79750mm dia piles
  • 5,600M350MPa
  • 166900mm dia piles
  • 2,800M365MPa
  • 2,300M380MPa
  • Secant Piles
  • Concrete Supply & Placement
  • Temporary Works Engineering
  • Quality Assurance
  • CFA Piles
  • Craneage and Rigging
  • Total of 1,224 CFA piles of varying diameters, including 296 deep foundation piles and 938 are secant retention piles
  • 420m of guide walls installed with the support of poly foam
  • 87 piles designed to a drill depth of approximately 36m
  • Loose and very soft layers of Crude Island Silt materially increased risk of concrete washout and soil intrusion between newly installed piles, making pile sequencing a critical consideration in the construction process
  • Located in the heart of Melbourne CBD, the site itself posed logistical difficulties. Every stage of construction, from service relocation to material deliveries, required careful planning and coordination. Access constraints and limited working space further compounded these challenges
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects