Lorimer Street
Crema Constructions
>6,500LM
total drill length
>45LM
average drill length
136
CFA foundation piles
36M
deep central bars
18M
cages
4,500M3
high MPa concrete
140T
steel reinforcement
Concrete Supply & Placement
Quality Assurance
CFA Piles
Craneage and Rigging
Design Engineering
Dynamic Pile Testing
Unique Attributes
Strict sequencing to maximise productivity whilst ensuring the quality of piles which were in close proximity to each other
Dynamic pile testing, utilising a 32 tonne hammer dropped from up to 3 metres high. All tests exceeded design capacity
Key Challenges
Accommodate high voltage power lines running adjacent to the piling line, as well as live services running through the piling line
Transport and logistics for delivery of 18 metre cages – with heavy vehicle access to site via reverse only
×
←
→